Sun 11/1
-
Mon 11/2
2 guests, 1 room
Deals from
$166
/Cheapest rate per night
Rooms
About
Reviews
Similar hotels
Location
FAQ

Best deals for Hotel Meilenstein

Sun 11/1
-
Mon 11/2
Double room
bed type unknown
$166
nightly with fees
bed type unknown
$172
nightly with fees
bed type unknown
$184
nightly with fees
King room
bed type unknown
$179
nightly with fees
*Total includes estimated local taxes & fees payable on check out.

About Hotel Meilenstein

Along with 3 restaurants, this smoke-free hotel has 2 bars/lounges and a health club. Free WiFi in public areas and free self parking are also provided. Other amenities include a snack bar/deli, a 24-...

Good to Know

Check-in time3:00 PM
Check-out time11:00 AM
Payment & CancellationPolicies vary by room type and provider.
Front desk number+41 76 545 64 46

Perks and amenities at Hotel Meilenstein

  • Fitness center
  • Restaurant
  • Bar/Lounge
  • Room service
  • Free Wi-Fi
  • Tea/coffee maker
  • Coffee machine
  • Free parking
  • Business center
  • Wi-Fi available in all areas

General

  • Computer use available
  • Wine glasses
  • Electric kettle
  • Entire unit wheelchair accessible
  • Extra-long beds (> 2 meters)
  • Family rooms
  • Cribs available
  • Feather pillow
  • Fire extinguisher
  • Laundry facilities
  • Ironing service
  • Flat-screen TV
  • Packed lunches
  • Free toiletries
  • Room service
  • Smoke alarms
  • Hardwood or parquet floors
  • Heating
  • Higher-level toilet
  • Hypoallergenic
  • Hypoallergenic pillow
  • Interconnected room(s) available
  • Key card access
  • CCTV in common areas
  • Kids meals
  • CCTV outside property
  • No smoking
  • Kid-friendly buffet
  • Restaurant
  • Bar/Lounge
  • Laptop safe
  • Express check-out
  • Lockers
  • Lower bathroom sink
  • Cable or satellite TV
  • Mountain view
  • Air-conditioned
  • Newspapers
  • Non-feather pillow
  • Food can be delivered to guest accommodation
  • Free parking
  • Bathrobe
  • Private bathroom
  • 24hr front desk
  • Designated smoking area
  • Night club
  • Storage available
  • Private parking
  • Radio
  • Non-smoking rooms available
  • Terrace/Patio
  • Increased accessibility
  • Roll-in shower
  • Safety deposit box
  • Seating area
  • Minibar
  • Shampoo
  • Shower
  • Shower cap
  • Rain showers
  • Shower chair
  • Accessible by elevator
  • Accessible parking
  • Adapter
  • Slippers
  • First-aid kit
  • Snack bar
  • Socket near the bed
  • Alarm clock
  • Allergy-free room
  • Baby safety gates
  • Soundproof rooms
  • Soundproofing
  • Body soap
  • Flexible event space
  • Bottle of water
  • Breakfast in the room
  • Tea/coffee maker
  • Telephone
  • Tile/marble floor
  • Toilet
  • Toilet paper
  • Toilet with grab rails
  • Toothbrush
  • City view
  • Clothes rack
  • Trash cans
  • Coffee machine
  • TV
  • Upper floors accessible by elevator
  • Conditioner
  • Desk
  • Walk-in shower
  • Wardrobe or closet

Activities

  • Cycling
  • Darts
  • Fitness classes
  • Fitness center
  • Horse riding
  • Bowling
  • Pool table
  • Hiking

Services

  • Business center
  • Car rental
  • Wake-up service
  • Daily housekeeping
  • Fax/photocopying
  • Concierge service
  • Currency exchange on-site
  • Laundry service
  • Meeting/Banquet facilities
  • Multi-lingual staff
  • Special diet menus (on request)
  • Tour desk
  • Shuttle service (additional charge)
  • Conference rooms
Show all 116 amenities

Reviews for Hotel Meilenstein

9.0
Wonderful1,344 verified ratings
Pros +
  • "Excellent hotel, friendly staff, very nice car museum and aquarium, new spacious rooms." (in 1 review)
  • Perfect breakfast in the relaxed atmosphere (in 5 reviews)
  • Staff was really nice and helpful (in 1 review)
Cons -
  • Outsading collection of classic cars and formula 1 cars. (in 1 review)
No reviews found. Try removing a filter, changing your search, or clear all to view reviews.

Hotels similar to Hotel Meilenstein

Explore Langenthal

FAQs when booking at Hotel Meilenstein

  • Is Hotel Meilenstein considered pet-friendly?

    Hotel Meilenstein is pet friendly. Feel free to bring your household pet if you’re staying at Hotel Meilenstein.

  • What is the Hotel Meilenstein phone number?

    If you have questions or concerns about your stay, call +41 76 545 64 46 to talk to a Hotel Meilenstein front desk representative.

  • Does Hotel Meilenstein have Wi-Fi available?

    Yes, Hotel Meilenstein has Wi-Fi available to hotel guests.

  • Is there a gym or fitness center at Hotel Meilenstein?

    Yes, Hotel Meilenstein has a fitness center available to guests throughout their stay.

  • What is the check-out time at Hotel Meilenstein?

    Check-out should be before 11:00 AM. For checking in at Hotel Meilenstein, guests should plan for any time after 3:00 PM on the day of their scheduled arrival.

  • How much does it cost to stay at Hotel Meilenstein, Langenthal?

    Hotel Meilenstein room prices depend on your dates, room type and availability. The average price found recently is $170/night, with the best deals starting from $128/night. To see current deals, enter your dates in the form above.

  • Is there a restaurant at Hotel Meilenstein?

    Yes, food can be ordered from the Hotel Meilenstein restaurant. Opening times may vary. For drinks at the accommodation, there is a bar available.

  • Does Hotel Meilenstein have a laundry service?

    Yes, there are laundry services usually available at Hotel Meilenstein, Langenthal. Guests can also use ironing facilities.

  • Does Hotel Meilenstein offer accessible rooms?

    Yes, Hotel Meilenstein provides accessible rooms for guests requiring them. Make sure to check the deals available on HotelsCombined for the latest availability.

  • What is the cheapest day to check into Hotel Meilenstein?

    Consider checking into Hotel Meilenstein on Wednesday, when the nightly price is typically at its lowest (average nightly rate of $196).

See more FAQs

Millions of Reviews

Real ratings and reviews from millions of guests, just like yourself. Book your perfect stay with confidence!

Best Hotel Deals

HotelsCombined sources over 3 million hotels and properties and compiles them in one place so you can compare the ideal accommodation.

Free Cancellation

Plans change — we get it. And that’s why you can search and book hotels and accommodations on HotelsCombined from agencies that offer free cancellation